High and Low Voltage Services

HV Installation, Testing & Commissioning

High Voltage Installations, Testing and commissioning services are offered to customers to fulfil project requirements on new builds and upgrades.
We work with our customers to meet deadlines and have experience in installing various manufacturers’ products, such as:

  • Vacuum Interruption Switchgear
  • SF6 Gas Switchgear
  • Oil Insulated Switchgear

The types of testing we undertake when commissioning new installations are all carried out to the relevant BS standards and recognised industry standards. Our specialist test equipment used to test the new installation is calibrated to BS EN ISO 10012: 2003 on an annual basis. Copies of all calibration test certificates are available at all times.

During the testing, various test sheets specific to the equipment installed are completed and electronic copies are issued to our customers. Examples of the testing undertaken during commissioning includes, but is not limited to:

  • AC / DC Pressure Testing
  • VLF Testing
  • Insulation Resistance Tests
  • Low Resistance Continuity Tests
  • Primary Current Injection Tests
  • Secondary Current Injection Tests
  • Switchgear Functionality Testing
4_HV_Testing
cropped

LV Installation, Testing & Commissioning

Low Voltage Installations, Testing and commissioning services are offered to customers to fulfil project requirements on new builds and upgrades.
We work with our customers to meet deadlines and have experience in installing various LV manufacturers’ panels and air circuit breakers.

The types of testing we undertake when commissioning new installations are all carried out to the relevant BS standards and recognised industry standards.

Our specialist test equipment used to test the new installation is calibrated to BS EN ISO 10012: 2003 on an annual basis. Copies of all calibration test certificates are available at all times. During the testing, various test sheets are completed and copies are issued to our customers. Examples of the testing undertaken during commissioning includes, but is not limited to:

  • AC / DC Pressure Testing
  • Insulation Resistance Tests
  • Low Resistance Continuity Tests
  • Primary Current Injection Tests
  • Secondary Current Injection Tests
  • Switchgear Functionality Testing